1 00:01:44,960 --> 00:01:42,120 success in flight did not come without 2 00:01:47,250 --> 00:01:44,970 failure during the past century 3 00:01:49,710 --> 00:01:47,260 explorers from Earth have failed many 4 00:01:51,240 --> 00:01:49,720 times to escape from their planet where 5 00:01:54,570 --> 00:01:51,250 they have been imprisoned by the chains 6 00:01:56,370 --> 00:01:54,580 of gravity since the dawn of time but 7 00:01:59,360 --> 00:01:56,380 with each failure came new knowledge 8 00:02:02,010 --> 00:01:59,370 with over the years led to success 9 00:02:04,350 --> 00:02:02,020 enabling space pioneers to build a 10 00:02:21,070 --> 00:02:04,360 celestial highway to take them on 11 00:02:25,800 --> 00:02:23,380 in the world of spaceflight hardware 12 00:02:29,170 --> 00:02:25,810 success requires reliable design 13 00:02:30,760 --> 00:02:29,180 manufacturing and testing after being 14 00:02:33,250 --> 00:02:30,770 manufactured and assembled with 15 00:02:35,260 --> 00:02:33,260 precision spacecraft are tested in a 16 00:02:37,030 --> 00:02:35,270 laboratory to determine if they can 17 00:02:39,430 --> 00:02:37,040 survive the rigorous launching into 18 00:02:42,760 --> 00:02:39,440 orbit and other hostilities of the space 19 00:02:45,010 --> 00:02:42,770 environment the idea of testing a 20 00:02:46,960 --> 00:02:45,020 machine before flying it began long 21 00:02:49,870 --> 00:02:46,970 before rocket flights commenced in the 22 00:02:52,540 --> 00:02:49,880 1940s the Wright brothers built their on 23 00:02:56,110 --> 00:02:52,550 win time and tested a variety of wind 24 00:02:58,090 --> 00:02:56,120 shapes they also flew more than 1000 25 00:03:01,750 --> 00:02:58,100 flights at Kitty Hawk with a powerless 26 00:03:05,350 --> 00:03:01,760 glider during 1902 one year before their 27 00:03:08,200 --> 00:03:05,360 historical powered flight Wilbur Wright 28 00:03:10,600 --> 00:03:08,210 to allay parental fears about the 1903 29 00:03:13,240 --> 00:03:10,610 flight wrote a letter to his father in 30 00:03:15,070 --> 00:03:13,250 which he said the man who wishes to keep 31 00:03:18,100 --> 00:03:15,080 it the problem long enough to really 32 00:03:20,880 --> 00:03:18,110 learn anything positively must not take 33 00:03:23,080 --> 00:03:20,890 dangerous risks carelessness and 34 00:03:25,690 --> 00:03:23,090 overconfidence are usually more 35 00:03:30,940 --> 00:03:25,700 dangerous than deliberately accepted 36 00:03:32,620 --> 00:03:30,950 risks Wilbur Wright concluded the Wright 37 00:03:34,960 --> 00:03:32,630 brothers understood that flying was 38 00:03:39,280 --> 00:03:34,970 risky but felt the dangers could be 39 00:03:41,320 --> 00:03:39,290 understood controlled and accepted the 40 00:03:43,960 --> 00:03:41,330 tradition of flight testing begun by the 41 00:03:46,479 --> 00:03:43,970 Wright brothers is continued today in a 42 00:03:47,949 --> 00:03:46,489 broadly expanded way and one of the 43 00:03:50,560 --> 00:03:47,959 world's leading space science 44 00:03:54,120 --> 00:03:50,570 laboratories NASA's Goddard Space Flight 45 00:03:56,260 --> 00:03:54,130 Center just outside of Washington DC 46 00:03:58,030 --> 00:03:56,270 Goddard is among the world's leading 47 00:04:01,000 --> 00:03:58,040 pioneers in developing the technology 48 00:04:03,430 --> 00:04:01,010 for building and environmentally testing 49 00:04:07,420 --> 00:04:03,440 scientific instruments spacecraft and 50 00:04:13,309 --> 00:04:10,039 Godard has the in-house capability to 51 00:04:15,589 --> 00:04:13,319 conceive design manufacture test and 52 00:04:18,289 --> 00:04:15,599 deliver scientific instruments and 53 00:04:21,099 --> 00:04:18,299 complete Space Systems to investigate 54 00:04:23,650 --> 00:04:21,109 the physical universe in which we live 55 00:04:26,090 --> 00:04:23,660 Goddard's overall capability to support 56 00:04:28,460 --> 00:04:26,100 wide-ranging scientific investigations 57 00:04:32,719 --> 00:04:28,470 makes it one of the most unique space 58 00:04:34,730 --> 00:04:32,729 science laboratories in the world during 59 00:04:36,770 --> 00:04:34,740 the 25 years that Goddard hardware 60 00:04:39,290 --> 00:04:36,780 capabilities were being developed more 61 00:04:42,620 --> 00:04:39,300 than 40 complete spacecraft systems were 62 00:04:45,110 --> 00:04:42,630 integrated and tested services for 63 00:04:48,140 --> 00:04:45,120 another 2,000 sounding rocket missions 64 00:04:51,020 --> 00:04:48,150 were also provided the Goddard team 65 00:04:53,060 --> 00:04:51,030 always striving for excellence has 66 00:04:56,600 --> 00:04:53,070 established a reliability record that is 67 00:04:58,520 --> 00:04:56,610 unparalleled in space technology since 68 00:05:01,790 --> 00:04:58,530 Goddard stores opened for business in 69 00:05:04,040 --> 00:05:01,800 1960 all spacecraft or spaceflight 70 00:05:05,570 --> 00:05:04,050 systems which were built integrated and 71 00:05:10,810 --> 00:05:05,580 tested at the Goddard Space Flight 72 00:05:13,580 --> 00:05:10,820 Center have worked successfully in orbit 73 00:05:15,320 --> 00:05:13,590 the manufacturing and testing facilities 74 00:05:18,040 --> 00:05:15,330 at Goddard were designed originally for 75 00:05:20,570 --> 00:05:18,050 the small Explorer class of spacecraft 76 00:05:22,399 --> 00:05:20,580 several modifications were made over the 77 00:05:25,250 --> 00:05:22,409 years to accommodate larger spacecraft 78 00:05:27,830 --> 00:05:25,260 or space systems like the orbiting 79 00:05:30,680 --> 00:05:27,840 astronomical observatory international 80 00:05:34,510 --> 00:05:30,690 ultraviolet Explorer solar maximum 81 00:05:36,610 --> 00:05:34,520 mission and the OSS one out 82 00:05:39,040 --> 00:05:36,620 currently Goddard is integrating and 83 00:05:43,059 --> 00:05:39,050 testing the cosmic background Explorer 84 00:05:45,040 --> 00:05:43,069 or Kobe for short Kobe is the largest 85 00:05:47,680 --> 00:05:45,050 spacecraft which can be integrated and 86 00:05:49,990 --> 00:05:47,690 tested using existing Goddard facilities 87 00:05:52,089 --> 00:05:50,000 Goddard plans to expand existing 88 00:05:54,219 --> 00:05:52,099 integration and testing facilities to 89 00:05:56,559 --> 00:05:54,229 accommodate the larger spacecraft under 90 00:06:01,390 --> 00:05:56,569 development today as well as those being 91 00:06:03,790 --> 00:06:01,400 designed for the 21st century the 92 00:06:05,379 --> 00:06:03,800 complex technologies associated with the 93 00:06:07,390 --> 00:06:05,389 development of space flight systems 94 00:06:10,059 --> 00:06:07,400 require the intimate partnership of 95 00:06:12,550 --> 00:06:10,069 engineers technicians and scientists to 96 00:06:15,399 --> 00:06:12,560 accomplish rapid progress at the 97 00:06:17,920 --> 00:06:15,409 frontiers of knowledge the design 98 00:06:20,980 --> 00:06:17,930 manufacturing and environmental testing 99 00:06:23,290 --> 00:06:20,990 teams atwater work in harmony like the 100 00:06:25,360 --> 00:06:23,300 members of a symphony orchestra to 101 00:06:28,050 --> 00:06:25,370 produce a result far beyond the 102 00:06:30,610 --> 00:06:28,060 capability of any single individual the 103 00:06:32,950 --> 00:06:30,620 Goddard facilities are instruments in 104 00:06:35,379 --> 00:06:32,960 the hands of professionals who operate 105 00:06:39,490 --> 00:06:35,389 them and are among the best in the 106 00:06:41,290 --> 00:06:39,500 aerospace community Goddard maintains a 107 00:06:42,969 --> 00:06:41,300 complete manufacturing facility 108 00:06:45,999 --> 00:06:42,979 including computer-aided manufacturing 109 00:06:47,500 --> 00:06:46,009 equipment and traditional manually 110 00:06:49,720 --> 00:06:47,510 operated machine 111 00:06:52,100 --> 00:06:49,730 by using computer-aided manufacturing 112 00:06:54,920 --> 00:06:52,110 techniques spaceflight hardware 113 00:06:58,310 --> 00:06:54,930 components can be machined using precise 114 00:07:00,440 --> 00:06:58,320 computer-controlled equipment computer 115 00:07:03,170 --> 00:07:00,450 aided manufacturing allows complex 116 00:07:05,180 --> 00:07:03,180 machine tasks to be performed including 117 00:07:07,820 --> 00:07:05,190 geometrical configurations with 118 00:07:09,770 --> 00:07:07,830 intersections of curves and angles that 119 00:07:15,680 --> 00:07:09,780 cannot be machined using traditional 120 00:07:17,240 --> 00:07:15,690 methods spacecraft and instrument 121 00:07:20,300 --> 00:07:17,250 components are electro chemically 122 00:07:22,340 --> 00:07:20,310 processed to guard against oxidation and 123 00:07:25,000 --> 00:07:22,350 to provide for thermal and electrical 124 00:07:27,160 --> 00:07:25,010 conductivity and electrical resistance a 125 00:07:29,210 --> 00:07:27,170 wide range of electroplating 126 00:07:32,840 --> 00:07:29,220 capabilities is available including 127 00:07:36,700 --> 00:07:32,850 nickel black nickel copper gold irrigate 128 00:07:39,350 --> 00:07:36,710 anodized silver and electro polishing 129 00:07:41,810 --> 00:07:39,360 for spacecraft thermal purposes 130 00:07:44,090 --> 00:07:41,820 inorganic tanks and are not commercially 131 00:07:47,120 --> 00:07:44,100 available are formulated and applied to 132 00:07:49,010 --> 00:07:47,130 flight hardware composite coatings and 133 00:07:50,750 --> 00:07:49,020 techniques are developed for the vacuum 134 00:07:54,290 --> 00:07:50,760 deposition of metals on spacecraft 135 00:07:56,270 --> 00:07:54,300 surfaces and experiments all the 136 00:07:58,400 --> 00:07:56,280 protective risers for the astronauts 137 00:08:02,420 --> 00:07:58,410 helmets are vacuum coated at dhadak 138 00:08:04,790 --> 00:08:02,430 using a unique process plastic and 139 00:08:06,830 --> 00:08:04,800 elastomer technology and fabrication 140 00:08:09,200 --> 00:08:06,840 services for constructing and assembling 141 00:08:11,990 --> 00:08:09,210 spacecraft and experimental components 142 00:08:14,420 --> 00:08:12,000 are available the ultraviolet 143 00:08:16,070 --> 00:08:14,430 transmitting plexiglass light pipes for 144 00:08:18,380 --> 00:08:16,080 the energetic gamma ray experiment 145 00:08:20,660 --> 00:08:18,390 telescope which will fly on the gamma 146 00:08:25,940 --> 00:08:20,670 ray Observatory were manufactured at 147 00:08:27,740 --> 00:08:25,950 Goddard Space Systems manufactured by 148 00:08:30,260 --> 00:08:27,750 Goddard are qualified through a rigorous 149 00:08:33,050 --> 00:08:30,270 verification program to assure flight 150 00:08:35,630 --> 00:08:33,060 readiness components are subjected to a 151 00:08:38,360 --> 00:08:35,640 wide range of tests and environmental 152 00:08:40,910 --> 00:08:38,370 exposures that simulate peak loads to be 153 00:08:43,220 --> 00:08:40,920 encountered during their lifetime after 154 00:08:45,590 --> 00:08:43,230 a spacecraft has been fully integrated 155 00:08:47,570 --> 00:08:45,600 the system is tested to make sure it 156 00:08:50,750 --> 00:08:47,580 works under anticipated flight and 157 00:08:52,640 --> 00:08:50,760 orbital conditions Goddard environmental 158 00:08:55,310 --> 00:08:52,650 testing capabilities are broadly divided 159 00:08:57,650 --> 00:08:55,320 into structural testing magnetic and 160 00:09:01,370 --> 00:08:57,660 electromagnetic measurements and space 161 00:09:03,920 --> 00:09:01,380 simulation structural testing includes 162 00:09:10,820 --> 00:09:03,930 all phases of static and dynamic testing 163 00:09:14,210 --> 00:09:10,830 covering vibration shock and orbit 164 00:09:16,430 --> 00:09:14,220 retrieval and landing these tests are 165 00:09:19,549 --> 00:09:16,440 conducted developing the integrity of 166 00:09:24,629 --> 00:09:22,170 static load testing provides a solution 167 00:09:26,879 --> 00:09:24,639 to the increasing need for step stress 168 00:09:30,389 --> 00:09:26,889 testing of structure using hydraulic 169 00:09:32,549 --> 00:09:30,399 loading systems acceleration testing 170 00:09:35,369 --> 00:09:32,559 instructors is an alternative to static 171 00:09:37,590 --> 00:09:35,379 load testing the launch base simulator 172 00:09:40,079 --> 00:09:37,600 is a high-capacity centric view and 173 00:09:44,579 --> 00:09:40,089 imposes loads on a structure typical of 174 00:09:45,059 --> 00:09:44,589 actual fight acceleration rod launch 175 00:09:47,400 --> 00:09:45,069 phase 176 00:09:49,980 --> 00:09:47,410 similarly can exert acceleration forces 177 00:09:55,170 --> 00:09:49,990 up to 30 G's on space structures 178 00:09:57,629 --> 00:09:55,180 weighing up to 5,000 pounds a dynamic 179 00:09:59,639 --> 00:09:57,639 test called mobile survey is also 180 00:10:02,639 --> 00:09:59,649 conducted the major the response of 181 00:10:04,829 --> 00:10:02,649 structures to vibratory load the modal 182 00:10:07,470 --> 00:10:04,839 server allows for a direct comparison 183 00:10:11,460 --> 00:10:07,480 with actual mobile parameters with the 184 00:10:13,769 --> 00:10:11,470 mathematical model migration exciters 185 00:10:16,319 --> 00:10:13,779 which generate a range of sine and 186 00:10:18,660 --> 00:10:16,329 random forces over a frequency range of 187 00:10:21,059 --> 00:10:18,670 five to two thousand Hertz and in 188 00:10:24,299 --> 00:10:21,069 whether than 30 pounds to 35 thousand 189 00:10:26,549 --> 00:10:24,309 pounds are they these exciter systems 190 00:10:28,739 --> 00:10:26,559 similarly the types of vibration space 191 00:10:31,319 --> 00:10:28,749 Hardware experience during launching and 192 00:10:33,900 --> 00:10:31,329 again during re-entry aboard the space 193 00:10:35,850 --> 00:10:33,910 shuttle to simulate the noise 194 00:10:37,559 --> 00:10:35,860 environment during launching space 195 00:10:39,929 --> 00:10:37,569 flight components are tested in an 196 00:10:42,600 --> 00:10:39,939 acoustic facility which consists of a 197 00:10:44,560 --> 00:10:42,610 reverberation chamber acoustic horns and 198 00:10:47,620 --> 00:10:44,570 noise generators 199 00:10:49,420 --> 00:10:47,630 noise levels up to 150 decibels which 200 00:10:51,700 --> 00:10:49,430 would see the shuttle environment level 201 00:10:55,170 --> 00:10:51,710 inside the shuttle payload Bay can be 202 00:10:57,550 --> 00:10:55,180 generated in the acoustic facility after 203 00:10:59,980 --> 00:10:57,560 structural loads testing is completed 204 00:11:02,890 --> 00:10:59,990 the spacecraft is subjected to ultrafine 205 00:11:05,320 --> 00:11:02,900 vacuum and chemical cleaning before it 206 00:11:11,020 --> 00:11:05,330 enters the plenum to begin electronic 207 00:11:12,550 --> 00:11:11,030 assembly and intubation cleanroom 208 00:11:15,040 --> 00:11:12,560 standards at Goddard are among the 209 00:11:17,500 --> 00:11:15,050 strictest in the aerospace industry the 210 00:11:20,170 --> 00:11:17,510 particles such as dust or human dandruff 211 00:11:22,390 --> 00:11:20,180 or contaminants such as grease or other 212 00:11:24,910 --> 00:11:22,400 hydrocarbons migrate to sensitive 213 00:11:27,850 --> 00:11:24,920 surfaces that could degrade components 214 00:11:29,770 --> 00:11:27,860 or balance contaminants can compromise 215 00:11:32,710 --> 00:11:29,780 the objective of a scientific instrument 216 00:11:35,980 --> 00:11:32,720 or can be the direct cause of a total 217 00:11:38,170 --> 00:11:35,990 spacecraft failure Goddard operates a 218 00:11:40,720 --> 00:11:38,180 main cleanroom for spacecraft assembly 219 00:11:43,450 --> 00:11:40,730 and several clean tents for the Assembly 220 00:11:45,490 --> 00:11:43,460 of subsystems and instruments the 221 00:11:47,740 --> 00:11:45,500 Goddard contamination control system 222 00:11:51,130 --> 00:11:47,750 filters the air to prevent particles of 223 00:11:53,680 --> 00:11:51,140 a size larger than one 300 the diameter 224 00:11:58,240 --> 00:11:53,690 of a single human hair from entering the 225 00:12:00,580 --> 00:11:58,250 cleanroom spacecraft and flight 226 00:12:03,220 --> 00:12:00,590 components also undergo magnetic and 227 00:12:05,350 --> 00:12:03,230 electromagnetic measurements and the 228 00:12:07,420 --> 00:12:05,360 magnetic test facility technicians 229 00:12:09,100 --> 00:12:07,430 perform simulations of the magnetic 230 00:12:11,829 --> 00:12:09,110 field environment of near 231 00:12:14,490 --> 00:12:11,839 torment or planetary space for 232 00:12:17,170 --> 00:12:14,500 calibrating instruments and spacecraft 233 00:12:19,600 --> 00:12:17,180 the magnetic test facility totally 234 00:12:21,670 --> 00:12:19,610 constructed from non-magnetic materials 235 00:12:24,130 --> 00:12:21,680 is the only one of its kind in the 236 00:12:27,160 --> 00:12:24,140 United States making it a national 237 00:12:28,750 --> 00:12:27,170 resource the Department of Defense and 238 00:12:31,150 --> 00:12:28,760 several other government agencies as 239 00:12:36,130 --> 00:12:31,160 well as private companies use the 240 00:12:38,410 --> 00:12:36,140 facility shielded rooms are available 241 00:12:40,600 --> 00:12:38,420 for electromagnetic interference and 242 00:12:43,630 --> 00:12:40,610 compatibility testing of flight hardware 243 00:12:45,610 --> 00:12:43,640 in a clean environment the frequency and 244 00:12:47,769 --> 00:12:45,620 amplitude of intentionally generated 245 00:12:50,110 --> 00:12:47,779 signals as well as spurious signals 246 00:12:52,710 --> 00:12:50,120 produced by the hardware are measured in 247 00:12:54,850 --> 00:12:52,720 the electromagnetic test facility 248 00:12:57,160 --> 00:12:54,860 electromagnetic compatibility Commerce 249 00:12:59,530 --> 00:12:57,170 which could interfere with spacecraft or 250 00:13:03,970 --> 00:12:59,540 instrument operation are detected and 251 00:13:05,610 --> 00:13:03,980 corrected spacecraft undergo their final 252 00:13:08,710 --> 00:13:05,620 tests in the space environment 253 00:13:10,600 --> 00:13:08,720 simulating although each of the many 254 00:13:13,090 --> 00:13:10,610 working parts of a spacecraft have been 255 00:13:15,130 --> 00:13:13,100 tested earlier at low levels higher than 256 00:13:17,590 --> 00:13:15,140 those expected for their space mission 257 00:13:20,410 --> 00:13:17,600 they are now asked to work again at 258 00:13:21,720 --> 00:13:20,420 expected loans as one single spacecraft 259 00:13:24,150 --> 00:13:21,730 system 260 00:13:26,129 --> 00:13:24,160 under vacuum conditions spacecraft 261 00:13:28,530 --> 00:13:26,139 experience a wide range of thermal 262 00:13:30,900 --> 00:13:28,540 conditions from a minus 300 degrees 263 00:13:34,620 --> 00:13:30,910 Fahrenheit to plus 200 degrees 264 00:13:36,900 --> 00:13:34,630 Fahrenheit during the entire thermal 265 00:13:39,210 --> 00:13:36,910 vacuum testing period spacecraft are 266 00:13:41,129 --> 00:13:39,220 operated at extreme and normal 267 00:13:43,920 --> 00:13:41,139 temperature just as if they were in 268 00:13:46,829 --> 00:13:43,930 orbit Goddard has several thermal vacuum 269 00:13:52,769 --> 00:13:46,839 chambers of various sizes up to 30 feet 270 00:13:54,840 --> 00:13:52,779 in diameter by 40 feet high Goddard's 271 00:13:56,939 --> 00:13:54,850 history in developing space systems for 272 00:13:59,850 --> 00:13:56,949 orbital flight has been long and 273 00:14:02,009 --> 00:13:59,860 distinguished Goddard is the only NASA 274 00:14:04,170 --> 00:14:02,019 federal government field center with an 275 00:14:05,730 --> 00:14:04,180 in-house capability of taking space 276 00:14:09,870 --> 00:14:05,740 hardware from design through 277 00:14:11,730 --> 00:14:09,880 manufacturing and testing with an eye 278 00:14:13,949 --> 00:14:11,740 toward the future Goddard has been 279 00:14:15,870 --> 00:14:13,959 assigned a major role for servicing 280 00:14:18,900 --> 00:14:15,880 spacecraft systems under development 281 00:14:22,889 --> 00:14:18,910 such as the Hubble Space Telescope grow 282 00:14:23,900 --> 00:14:22,899 new ARS and future spacecraft such as 283 00:14:26,639 --> 00:14:23,910 access 284 00:14:28,800 --> 00:14:26,649 guards parking space craft servicing 285 00:14:31,350 --> 00:14:28,810 on-orbit is an outgrowth of the Center's 286 00:14:35,160 --> 00:14:31,360 success in the pioneering solar max 287 00:14:37,470 --> 00:14:35,170 repair mission to accommodate future 288 00:14:39,930 --> 00:14:37,480 spacecraft systems such as the Explorer 289 00:14:41,970 --> 00:14:39,940 series as well as the co-orbiting and 290 00:14:44,160 --> 00:14:41,980 polar platforms for Space Station 291 00:14:47,850 --> 00:14:44,170 Goddard is planning to expand existing 292 00:14:49,829 --> 00:14:47,860 integration and testing facilities for 293 00:14:52,110 --> 00:14:49,839 this next generation of spacecraft for 294 00:14:53,970 --> 00:14:52,120 work operations will be demonstrated 295 00:14:56,250 --> 00:14:53,980 first on the ground in a clean 296 00:14:58,280 --> 00:14:56,260 laboratory environment to protect the 297 00:15:00,750 --> 00:14:58,290 flight hardware from contamination 298 00:15:03,329 --> 00:15:00,760 facilities which provide a contamination 299 00:15:05,340 --> 00:15:03,339 free environment are essential to the 300 00:15:12,010 --> 00:15:05,350 reliable performance of the large 301 00:15:16,790 --> 00:15:14,630 the Goddard Space Flight Center stands 302 00:15:21,230 --> 00:15:16,800 ready to take the next major step in 303 00:15:23,510 --> 00:15:21,240 space research in 1984 President Reagan 304 00:15:24,910 --> 00:15:23,520 permitted the United States to having a 305 00:15:28,310 --> 00:15:24,920 permanently manned space station 306 00:15:30,550 --> 00:15:28,320 operating within a decade the president 307 00:15:34,750 --> 00:15:30,560 said that a space station was needed for 308 00:15:37,760 --> 00:15:34,760 peaceful economic and scientific game 309 00:15:41,510 --> 00:15:37,770 space station is NASA's next logical 310 00:15:43,940 --> 00:15:41,520 step in America's space program Goddard 311 00:15:46,550 --> 00:15:43,950 is planning facilities to support NASA's 312 00:15:49,520 --> 00:15:46,560 space science program in the 1990s and 313 00:15:50,330 --> 00:15:49,530 space exploration well into the 21st 314 00:15:52,850 --> 00:15:50,340 century 315 00:15:56,180 --> 00:15:52,860 when pioneering men and women from many